Tweed's flood planning controls

We’re updating our flood planning controls and we want to make sure we’ve got it right. That’s why we’re inviting you to have your say. Your local knowledge and lived experience are key to helping us better protect our community from future flood risks.

These updates will help ensure new homes and buildings are built above known flood levels, with a lower risk of flooding and greater resilience to climate change. Your feedback will help finalise both the Interim Flood Planning Levels Policy and the proposed updates to the Development Control Plan Section A3 – Development of Flood Liable Land (DCP-A3).

We’re seeking your feedback on the draft:

These updates respond to the 2022 flood event and incorporate new data from the Tweed Valley Flood Study Update and Expansion 2024. They also include allowances for climate change to ensure new development is safer and more resilient.



Why is this happening?


Aerial photograph showing extensive floodwaters inundating the Condong sugar mill and adjacent agricultural fields, with muddy water submerging roads and nearby properties.Aerial view around the Condong sugar mill and surrounding farmland during the February 2022 flood.

In 2022, parts of the Tweed experienced flooding that went above the levels we plan for. We've now completed a new flood study with updated data and mapping, including climate change projections. These changes will help make sure new buildings are better protected from flooding and future climate impacts.


Flood planning levels are usually set through a detailed process called a Flood Risk Management Study. We've started updating these studies, but they will take several years to complete. While this work is underway, we’re exhibiting the draft Interim Flood Planning Levels Policy to guide development decisions in flood-prone areas. This policy is now open for community feedback.

We’re also proposing updates to DCP-A3. The draft is now on public exhibition at the same time and we’re inviting your input to help finalise the changes.



What's changing?

  • Flood planning levels (minimum floor levels) will be based on the highest of:
    • 2009 flood study 1% AEP (old level)
    • 2024 flood study 0.2% AEP (as an allowance for climate change)
    • the flood of record (e.g. 2022, 2017, 1989, 1954)
    • a minimum 2.9 m AHD (to account for sea level rise)
    • 0.5 m freeboard.
  • Updates to various DCP-A3 controls and flood hazard mapping.



Explore changes in your area

Screenshot of Tweed Shire Council’s interactive flood planning map showing proposed flood planning levels across the Tweed region. The map includes a color-coded legend for flood planning levels (FPL) ranging from 3.4 to 4.9 meters, property boundaries, and red lines indicating waterways. A sidebar on the left lists options such as Proposed Flood Planning Level, Proposed PMF, Proposed High Flow, Hazard Category, and Current DCP-A3 Mapping.

Use the interactive flood planning map to see how the proposed planning controls may apply to your property or area. The map shows current and proposed flood planning levels and development controls under Section A3 of the Development Control Plan – Development of Flood Liable Land.

The interactive map is best viewed on a desktop, tablet or a device with a bigger screen. It's not designed for mobile use due to the level of detail and data displayed.

Overview of the interactive map

The main navigation on the left-hand side of the page will provide you with the following information:

  • Proposed Defined Flood Event (DFE)
    The DFE is the flood event used as a general standard for managing flood risk to development. It is usually based on floods of a specific Annual Exceedance Probability (AEP), significant historical events, or a combination of both. The proposed DFE is shown on the map in metres (m AHD), which means height above sea level.
  • Proposed Flood Planning Level (FPL)
    The FPL combines the DFE with a freeboard – a safety margin to provide reasonable certainty that the selected risk exposure is achieved. In Tweed Shire, the freeboard is 0.5 metres and is added to the DFE level. This is also shown in m AHD.
  • Proposed Probable Maximum Flood (PMF)
    The PMF represents the largest flood that could conceivably occur at a location – a catastrophic event with very low likelihood. Updates to PMF mapping apply to the Tweed Valley Flood Study Update and Expansion 2024. Coastal Creeks PMF mapping remains unchanged.
  • Proposed High Flow
    These are areas of the Tweed Valley and Coast Creeks floodplain that carry most floodwaters. Obstructions here can worsen upstream flooding. DCP-A3 limits fill and building in these areas. Updates to high flow area mapping are limited to the Tweed Valley and result from the Tweed Valley Flood Study Update and Expansion 2024. Coastal Creeks high flow area mapping remains the same.
  • Flood Hazard Category
    Hazard categories combine flood function and hazard mapping to classify areas as floodway, high hazard flood storage, low hazard flood storage or flood fringe. Certain high-risk areas prohibit development such as dual occupancy or secondary dwellings under DCP-A3.
  • Defined Flood Event Source
    For information only. Shows the historic or design event that forms the basis of the proposed DFE and FPL.
  • Change in Defined Flood Event
    For information only. Shows differences between current and proposed DFE levels. Areas upstream of Murwillumbah appear blue (“Was Dry Now Wet”) because previous mapping did not cover these areas.
  • Current DCP - A3 Mapping
    Existing maps provided for comparison. Multiple maps are available in the right panel.

Tips for using the interactive map

  • Best viewed on desktop, tablet or device with bigger screen (not designed for mobile).
  • Click the search icon (top right) to find an address.
  • Use the left menu to switch between views.
  • Search address first, then select views to see data for your location.



Community drop-in sessions


Indoor community consultation event with several tables displaying planning documents and maps, where attendees are speaking with Council staff and reviewing printed materials.Join us at a community drop-in session this November to learn about the interim policy and changes to DCP-A3.

In addition to the draft Interim Flood Planning Levels Policy and the proposed updates to the Development Control Plan Section A3 – Development of Flood Liable Land, the Development Control Plan is also being reviewed to simplify the document and create a more user-friendly resource for the community and stakeholders.


Stay tuned for a list of community drop-in sessions happening across the Tweed in November. These sessions are your opportunity to speak with Council staff and learn more about the:

  • draft Interim Flood Planning Levels Policy
  • proposed changes to Section A3 of the DCP – Development of Flood Liable Land
  • draft changes to the overall Development Control Plan – visit the Development Control Plan draft improvements page for more details about this project.

Session dates will be advertised in the Tweed Link and on this project page.



Have your say

Share your feedback by 4 pm on Wednesday 3 December 2025 in one of the following ways:


We’re updating our flood planning controls and we want to make sure we’ve got it right. That’s why we’re inviting you to have your say. Your local knowledge and lived experience are key to helping us better protect our community from future flood risks.

These updates will help ensure new homes and buildings are built above known flood levels, with a lower risk of flooding and greater resilience to climate change. Your feedback will help finalise both the Interim Flood Planning Levels Policy and the proposed updates to the Development Control Plan Section A3 – Development of Flood Liable Land (DCP-A3).

We’re seeking your feedback on the draft:

These updates respond to the 2022 flood event and incorporate new data from the Tweed Valley Flood Study Update and Expansion 2024. They also include allowances for climate change to ensure new development is safer and more resilient.



Why is this happening?


Aerial photograph showing extensive floodwaters inundating the Condong sugar mill and adjacent agricultural fields, with muddy water submerging roads and nearby properties.Aerial view around the Condong sugar mill and surrounding farmland during the February 2022 flood.

In 2022, parts of the Tweed experienced flooding that went above the levels we plan for. We've now completed a new flood study with updated data and mapping, including climate change projections. These changes will help make sure new buildings are better protected from flooding and future climate impacts.


Flood planning levels are usually set through a detailed process called a Flood Risk Management Study. We've started updating these studies, but they will take several years to complete. While this work is underway, we’re exhibiting the draft Interim Flood Planning Levels Policy to guide development decisions in flood-prone areas. This policy is now open for community feedback.

We’re also proposing updates to DCP-A3. The draft is now on public exhibition at the same time and we’re inviting your input to help finalise the changes.



What's changing?

  • Flood planning levels (minimum floor levels) will be based on the highest of:
    • 2009 flood study 1% AEP (old level)
    • 2024 flood study 0.2% AEP (as an allowance for climate change)
    • the flood of record (e.g. 2022, 2017, 1989, 1954)
    • a minimum 2.9 m AHD (to account for sea level rise)
    • 0.5 m freeboard.
  • Updates to various DCP-A3 controls and flood hazard mapping.



Explore changes in your area

Screenshot of Tweed Shire Council’s interactive flood planning map showing proposed flood planning levels across the Tweed region. The map includes a color-coded legend for flood planning levels (FPL) ranging from 3.4 to 4.9 meters, property boundaries, and red lines indicating waterways. A sidebar on the left lists options such as Proposed Flood Planning Level, Proposed PMF, Proposed High Flow, Hazard Category, and Current DCP-A3 Mapping.

Use the interactive flood planning map to see how the proposed planning controls may apply to your property or area. The map shows current and proposed flood planning levels and development controls under Section A3 of the Development Control Plan – Development of Flood Liable Land.

The interactive map is best viewed on a desktop, tablet or a device with a bigger screen. It's not designed for mobile use due to the level of detail and data displayed.

Overview of the interactive map

The main navigation on the left-hand side of the page will provide you with the following information:

  • Proposed Defined Flood Event (DFE)
    The DFE is the flood event used as a general standard for managing flood risk to development. It is usually based on floods of a specific Annual Exceedance Probability (AEP), significant historical events, or a combination of both. The proposed DFE is shown on the map in metres (m AHD), which means height above sea level.
  • Proposed Flood Planning Level (FPL)
    The FPL combines the DFE with a freeboard – a safety margin to provide reasonable certainty that the selected risk exposure is achieved. In Tweed Shire, the freeboard is 0.5 metres and is added to the DFE level. This is also shown in m AHD.
  • Proposed Probable Maximum Flood (PMF)
    The PMF represents the largest flood that could conceivably occur at a location – a catastrophic event with very low likelihood. Updates to PMF mapping apply to the Tweed Valley Flood Study Update and Expansion 2024. Coastal Creeks PMF mapping remains unchanged.
  • Proposed High Flow
    These are areas of the Tweed Valley and Coast Creeks floodplain that carry most floodwaters. Obstructions here can worsen upstream flooding. DCP-A3 limits fill and building in these areas. Updates to high flow area mapping are limited to the Tweed Valley and result from the Tweed Valley Flood Study Update and Expansion 2024. Coastal Creeks high flow area mapping remains the same.
  • Flood Hazard Category
    Hazard categories combine flood function and hazard mapping to classify areas as floodway, high hazard flood storage, low hazard flood storage or flood fringe. Certain high-risk areas prohibit development such as dual occupancy or secondary dwellings under DCP-A3.
  • Defined Flood Event Source
    For information only. Shows the historic or design event that forms the basis of the proposed DFE and FPL.
  • Change in Defined Flood Event
    For information only. Shows differences between current and proposed DFE levels. Areas upstream of Murwillumbah appear blue (“Was Dry Now Wet”) because previous mapping did not cover these areas.
  • Current DCP - A3 Mapping
    Existing maps provided for comparison. Multiple maps are available in the right panel.

Tips for using the interactive map

  • Best viewed on desktop, tablet or device with bigger screen (not designed for mobile).
  • Click the search icon (top right) to find an address.
  • Use the left menu to switch between views.
  • Search address first, then select views to see data for your location.



Community drop-in sessions


Indoor community consultation event with several tables displaying planning documents and maps, where attendees are speaking with Council staff and reviewing printed materials.Join us at a community drop-in session this November to learn about the interim policy and changes to DCP-A3.

In addition to the draft Interim Flood Planning Levels Policy and the proposed updates to the Development Control Plan Section A3 – Development of Flood Liable Land, the Development Control Plan is also being reviewed to simplify the document and create a more user-friendly resource for the community and stakeholders.


Stay tuned for a list of community drop-in sessions happening across the Tweed in November. These sessions are your opportunity to speak with Council staff and learn more about the:

  • draft Interim Flood Planning Levels Policy
  • proposed changes to Section A3 of the DCP – Development of Flood Liable Land
  • draft changes to the overall Development Control Plan – visit the Development Control Plan draft improvements page for more details about this project.

Session dates will be advertised in the Tweed Link and on this project page.



Have your say

Share your feedback by 4 pm on Wednesday 3 December 2025 in one of the following ways:


Page last updated: 22 Oct 2025, 07:51 AM